Yahoo Search Búsqueda en la Web

Resultado de búsqueda

  1. www.andover.edu › learning › academic-curriculumMusic - Andover

    Learn about Andover's music program, faculty, and courses. Explore the new music building, practice rooms, and performance ensembles.

    • Cue the music!

      The facility will be Phillips Academy’s first purpose-built...

  2. 15 de feb. de 2023 · The Academy will break ground on a 30,000-square-foot facility for music education and performance, thanks to a $24 million gift from Board President Amy Falls and her husband Hartley Rogers. The center will be the first purpose-built structure for music at Andover and part of a new cultural corridor on campus.

  3. 5 de nov. de 2018 · The Academy is making an unprecedented investment in the musical arts with a new instructional and performance center that will elevate the Andover experience for the entire campus community. The 30,000-square-foot structure will replace an outmoded Graves Hall—which will be thoughtfully repurposed—and serve the more than 700 students who ...

  4. 15 de feb. de 2023 · The 30,000-square-foot center, expected to open in the fall of 2024, will be named for Amy Falls, president of the Board of Trustees. The facility will feature a 250-seat performance hall, flexible ensemble spaces and classrooms, and a rock room with recording and broadcast capabilities.

  5. 15 de sept. de 2022 · A spacious 30,000-square-foot facility with a 250-seat performance hall and ensemble rooms, the new music building will be located on Phillips Street alongside the Robert S. Peabody Museum of Archeology, and will become Andover’s new cultural corridor.

  6. 21 de sept. de 2021 · Plans for a new music building at #Andover are hitting all the right notes, with space for performance and practice, an electronic music studio, technology labs, classrooms, and more. Read how #PhillipsAcademy is setting the stage for musical creativity and collaboration at https://www.andover.edu/news/2021/building-the-future # ...

  7. 26 de feb. de 2024 · ANDOVER — Music will soon have a new home at Phillips Academy. Construction on the 30,000-square-foot Falls Music Center is set to be complete by the fall, according to Music Department chair Abbey Siegfried.